Project Description

This project involves the demolition, remediation and redevelopment of a former manufacturing facility which was used for the production and storage of automotive batteries.

SCOPE OF WORK:

  • Asbestos abatement and hazardous material removal and disposal.
  • Demolition of multiple structures including slabs.
  • Processing and recycling/reuse of over 20,000 tons of concrete and masonry materials.
  • Source area excavation of over 80,000 cubic yards of lead contaminated soil.
  • Installation of a temporary structure and operation of a pug mill to stabilize over 90,000 tons of lead contaminated soil.
  • Consolidation and placement of treated material on site.
  • Excavation of over 10,000 cubic yards of TENORM Radioactive Material.
  • Volume reduction of TENORM for disposal by mechanically screening the material.
  • Removal of underground storage tanks.
  • Construction of a clean utility corridor and storm sewer system.
  • Installation of a site-wide soil cover system.
  • Construction of a 5-acre park donated to the City of Niagara Falls.